Endura-Craft Square Tapered


Composite PVC Column Wraps

Craftsman Square Tapered PVC Column Wraps

With the look and feel of natural stone, Endura-Craft™ columns are the most popular column for both interior columns and exterior columns. Endura-Stone™ columns offer exceptionally low maintenance, the look-and-feel of natural stone, and a range of applications unequalled by conventional wood columns. They are non-porous, waterproof, and impervious to termite and carpenter ant attack as well as staining and decaying fungi.

Measure overall opening from floor to beam or soffit (must have structural pressure-treated post or lally column for load support.) Trim shaft pieces to 2¼" shorter than opening - 2" for cap/base, ¼" for expansion (¼" if not using cap and base - each part is 1" thick.) Always trim from bottom ONLY - top is marked. If you are going to use screws, pre-drill/countersink all panels. See joint diagram on next page to determine which edge to pre-drill. Lay 3 panels flat and apply adhesive to center joints. (Polyurethane glue is recommended. Follow manufacturer's instructions.)
Assemble three panels, using E-Z lock joints. If you are not using screws, finish nail three panels together. If using screws, assemble three panels together using coarse thread galvanized screws (deck screws). Slide ¾ base around post.
Glue ¼ piece of base using biscuits (supplied). Center and attach to floor/pedestal with appropriate fasteners. Slide assembled 3-sided column around support (on top of base). Slide ¾ cap into place on top of column panels.* Raise cap to beam/soffit, center, and attach. There should ¼" between column and cap platform.
Apply adhesive to final panel. Assemble final panel to column using E-Z lock joint. Screw or nail final panel to secure. Glue ¼ cap piece and slide into place. Pin nail cap moulding to top of column.*
Using miter saw, cut base trim pieces to fit around bottom of column. Use column shaft to mark cut lines for miters (cut long and work your way shorter for best results). Apply adhesive to moulding and pin-nail into place. Caulk using latex caulking compound to fill in gaps & nail or screw holes.
 
Clean surface of column with cleaner recommended by the paint manufacturer. Paint with 2 coats of acrylic latex paint.  

* Column must not be allowed to collect water, debris, etc. If the top of the column extends beyond the soffit/beam, the cap must be flashed with lead, copper, aluminum, etc. to prevent accumulation.

Please note the correct assembly of the E-Z Lock joint shown at the left. The screws or nails MUST be installed only in the edges shown (3 and 4). Installing on the other edges will result in open seams. (Pre-drill if using screws.)

1.) Glue both joint edges; slide 1st joint together.

2.) Push 2nd joint closed.

3.) Nail or screw this joint first.

4.) Nail or screw this joint second.

Notes:

  • Panels are marked "TOP" - trim from the bottom only.
  • Cap and base pieces are also marked as "CAP" or "BASE".
  • Only use non-corrosive fasteners - galvanized, stainless steel, etc.
  • Always follow glue and paint manufacturer's instructions.